S36 open to traffic
On November 12, 2020, ASFINAG put more than five and a half kilometers of the new S 36 Murtal expressway between St. Georgen ob Judenburg and Unzmarkt-Frauenburg into operation. In the past three and a half years, the existing B317 federal road has been expanded into an expressway and a 950 meter long underground route has been built in Unzmarkt.
In total, with the already completed 1.7 kilometer long construction lot in St. Georgen, more than seven kilometers of new expressway are available, which above all mean a significant increase in traffic safety and a noticeable improvement in the quality of life for the residents. The project costs for the entire new section amount to around € 165 million.
Thomas Lorenz ZT GmbH was responsible for the local construction supervision for this Styrian infrastructure key project. With a highly professional project management, in addition to the core – the Unzmarkt underground route – 22 support measures, 5 bridges, 3 culverts, 10 water protection systems and numerous hydraulic engineering measures including a 500-meter-long Mur relocation were implemented on schedule and according to plan. The residents of Unzmarkt-Frauenburg in particular benefit from the new underground route – traffic through the town and the division of the town in two by the old route are a thing of the past.
Share this post:
Facebook
Twitter
LinkedIn
WhatsApp
E-Mail
More news
TPV kindergarten topping-out ceremony
19. April 2024
Renovation of LKH Graz II, south site starts
12. April 2024
Groundbreaking ceremony for new FH Health Campus Kapfenberg
29. March 2024
Steel construction day at the HTL Graz-Ortweinschule
22. March 2024
Construction Info Day 2023 at FH JOANNEUM
3. November 2023
Trial operation phase clinic Oberwart starts!
22. September 2023
Construction site visit S 7 Fürstenfelder Schnellstraße
15. September 2023