LKH Graz – New Dental Clinic

Crown, Heart und Kilo Newton

For the University Dental School, a new construction was built in two phases on the area just to the east of the existing LKH University Clinic in Graz. The first stage incorporates all point-of-care services, with the second stage establishing the non-patient centred functions including teaching and research. Tram line 7 stops right at the front door. The tracks had to be decoupled so the vibrations of the tram did not reach the clinic. The supports also had to be designed so that they could withstand a collision with a derailed tram.

Services:
Project Information:
Leistungszeitraum.png
Period

2009 - 2015

Auftraggeber.png
Client

KIG Krankenanstalten Immobiliengesellschaft mbH

Kosten.png
Costs

30.5 M.