Old becomes new
Where a listed existing building once stood, a completely new building was erected. Directly on the banks of the Moskva River, a seven-storey office and residential building with a gross floor area of approx. 6,000 m² was built.
No problem
Building in an inner-city location, monument protection, river proximity, language barrier? No problem. The existing façade was supported and preserved, and a deep foundation was built due to the poor soil conditions in the bank area. For the coordination with the authorities and the English-Russian drafting of statics and plans, a separate interpreter was hired without further ado.
Project Information:
![0000 000 Fo 190916 Tragwerksplanung](https://www.tlorenz.at/content/uploads/2020/04/0000_000_FO_190916_Tragwerksplanung.png)
Static-constructive processing
2005 - 2008
![Leistungszeitraum.png](https://www.tlorenz.at/content/uploads/2020/04/Leistungszeitraum.png)
Period
2005 - 2008
![Auftraggeber.png](https://www.tlorenz.at/content/uploads/2020/04/Auftraggeber.png)
Client
"Müller Russia" Architecture Moscow
![Kosten.png](https://www.tlorenz.at/content/uploads/2020/04/Kosten.png)
Construction costs