Always on the move...
…they are, the trains of the ÖBB. But at one location, everything is at a standstill. The new ÖBB headquarters on the southern forecourt of Vienna’s main railway station is a quiet and elegant building. At the end of July 2009, the architectural firm of Zechner & Zechner ZT GmbH from Vienna emerged as the winner of the architectural competition from a total of 56 submissions. HÖSBA Projektentwicklungs- und Verwertungs GmbH&CoKG, formed by Habau, Östu-Stettin and BAI, is responsible for the construction. The S-shaped, 23-storey building has a gross floor area of approx. 60,000 m² and provides space for around 1,600 railway employees.
3 storeys go into the ground, in an inner-city location a challenge for the excavation support, executed with anchored bored piles. The floor slabs are curved and offset, sloping supports the result.
![0000 000 Fo 190916 Tragwerksplanung](https://www.tlorenz.at/content/uploads/2020/04/0000_000_FO_190916_Tragwerksplanung.png)
Static-constructive processing
HÖSBA Projektentwicklungs- und Verwertungs GmbH&CoKG
![Leistungszeitraum.png](https://www.tlorenz.at/content/uploads/2020/04/Leistungszeitraum.png)
2009 - 2014
![Auftraggeber.png](https://www.tlorenz.at/content/uploads/2020/04/Auftraggeber.png)
HÖSBA Project Development and Utilization GmbH&CoKG