Flood? No problem
Due to the construction of the new, twin-tracked Koralm Graz-Klagenfurt railway, the Object FW13 Railway Bridge Kainach was built between Wundschuh and Wettmannstätten at km 22,081.500. This encompassed a four-span, supporting structure with a length of 115 metres. Due to the lower foreland on both sides of the Kainach, even a flood of the century is not a problem for either the structure or the train traffic.
Project Information:
![0000 000 Fo 190916 Tragwerksplanung](https://www.tlorenz.at/content/uploads/2020/04/0000_000_FO_190916_Tragwerksplanung.png)
Service
Static-constructive processing
static-constructive processing
![Leistungszeitraum.png](https://www.tlorenz.at/content/uploads/2020/04/Leistungszeitraum.png)
Period
2004 - 2007
![Auftraggeber.png](https://www.tlorenz.at/content/uploads/2020/04/Auftraggeber.png)
Client
ÖBB-Infrastruktur AG
![Stuetzweite.png](https://www.tlorenz.at/content/uploads/2020/04/Stuetzweite.png)
Span width